PROJECTS

A more than 30-year history that makes us a benchmark in the construction industry.

Excavation

Preparation for the laying of a 600 m3 fireproof tank

1 (2)
Base
Plinth for electrical line preparation for cogenerator
M47 (1)
Plant lines
Preparation of electrical and water systems with associated manholes.